Case Study 3 PTS installed 2 new boilers with PHE and associated pumps and controls in a small discussed store room on ground floor of office.
Case Study 2 PTS were tasked to install two new boilers and associated pumps and new controls as existing were not accessible for engineers.
Case Study 1 PTS were tasked to replace a gas fire HWS system to an electric powered HWS system . This involved removal of existing plant, replace pumps and reroute of pipework.